Keep permit preparation, review, issue and closure in one workflow. Connect the scope of work, responsible people and supporting documents to the permit record.
Permit details linked to the site and planned work
Scope, conditions and supporting documents kept together
Named people responsible for review and authorisation
Maintain a temporary works register with locations, supporting documents and inspection records.
Create an item on the project register. Add the location and supporting information, and place a marker on a site plan when that helps the team find it.
The responsible team keeps the item current and records inspections against it as work progresses.
Open the register item later to retrieve its details, attachments and inspection history.
Manage Control of Substances Hazardous to Health (COSHH) records, safety data sheets (SDS) and review schedules with clear visibility for site supervisors.
Centralised chemical inventory with site and project allocation
SDS upload, storage, and retrieval for field teams
Risk indicators and review reminders for assessments
Keep safety data sheets easy to find and connected to the right substance. Bring supplier documents, revision information and COSHH records into one connected workflow.
Safety data sheet storage linked to substance records
Supplier and revision details alongside each document
Site and project context for the substances in use
Record quality checks against the work, with photographs and clear findings. Keep the inspection, any defects and the next review connected to the same project.
Quality checklists for the work or installation being inspected
Inspection findings with notes and supporting photographs
Keep site setup, weekly and monthly checks in a consistent inspection record. Plan the inspection, record what needs attention and connect the follow-up to the site.
Inspection formats for site setup, weekly and monthly reviews
Planned checks linked to the relevant site
Inspection notes, photographs and recorded outcomes
Give each snag or defect a clear location, a useful photograph and a responsible owner. Keep progress and close-out evidence with the original finding.
Snags and defects recorded against a project and location
Keep vibratory equipment usage records connected to the operator, tool and task. Use configured usage alerts to bring records that need review to the team's attention.
Control construction drawings and specifications with a register, revision history and drawing markup.
Upload the document to the project register with its revision details. Keep later issues with the same document record.
The site team checks the current revision and can mark up a drawing. If a detail needs clarification, raise a separate RFI and attach the relevant evidence.
Retrieve the current or superseded revision, its file and saved markups from the drawing record.
Organise project documents and site photographs together. Keep location information with geotagged evidence so teams can understand where a record belongs.
Project files organised around the site and the work
Photographs stored alongside relevant project records
Geotagged images with location context where captured
Bring everyday construction forms into one management system. Keep submissions, supporting documents and review actions connected to the right site and team.
Reusable forms for recurring site and office tasks
Submissions linked to the relevant project and team
Supporting documents and photographs kept with the form
Keep policy reviews on the calendar and route the current revision to the responsible director for sign-off. Retain the review decision alongside the policy record.
A central record of policies and their current revisions
Connect site induction records and supporting documents to the person attending. Give supervisors a clearer view of the information captured before work begins.
Inductions linked to a worker and the relevant site
Supporting document capture alongside the induction
Recorded acknowledgements of induction information
Record site arrivals and departures through a tablet kiosk. Keep attendance activity connected to the site and the people using it, alongside their induction records.
Tablet kiosk sign-in and sign-out at the site entrance
Give subcontractors their own view of assigned snags, relevant permits and documents shared with them.
Set up the subcontractor and grant portal access. Assign the snag or permit, or share the document with that subcontractor.
The subcontractor opens the relevant portal record and can mark an assigned snag done. The supervisor reviews the fix in the internal register and records the sign-off.
The project team can return to the internal snag record for evidence and sign-off, or review the relevant permit or document record.